Lender’s Technical Advisor for development of 4.8 MW Waki Hydropower Plant in Western UgandaView ProjectBugoye Hydropower Plant Survey MonitoringView ProjectTopographical Survey, Bathymetric Survey and Geotechnical Investigations for Achwa HPP3 (8 MW) Project in UgandaView ProjectTime and Traffic Survey at Moyale Border PostView ProjectDetailed Design and Construction Supervision for the Development of Water and Sanitation Infrastructure for the Mbarara & Masaka Areas Package 1: Kagera Water Works Gauge Installation and Water Level MeasurementView ProjectTime and Traffic Survey at Nakonde/Tunduma Border PostView ProjectBaseline Surveys for Uganda Transport Programmes (Ntoroko Port and Goli Border Post) and Democratic Republic of Congo Ports programmes (Kalundu, Kasenyi,) and Mahagi Border Posts.View ProjectDetailed Design and Construction Supervision for the Development of Water and Sanitation Infrastructure for the Mbarara & Masaka Areas Package 2: Kagera Water Works: Bathymetric survey and flow velocity measurement on Kagera RiverView ProjectUpdate of Environment and Social Impact Assessment to IFC Performance Standards for 15.5 MW Kikagati Hydropower Project on River KageraView ProjectEnvironment and Social Impact Assessment of Proposed 45 MW Kinyara Co-generation Plant Expansion in Masindi, Western Uganda.View ProjectTraffic Impact Assessment for Vehicle Inspection points on major highways exiting Kampala (Kampala – Jinja Road, Kampala – Mpigi Road), Kampala – Masaka Road and Kampala – Entebbe Road)View ProjectTurbine Axis Verification & Switchyard Elevation Check for Kikagati Hydropower Project (15.5 MW)View Project12345