Turbine Axis Verification & Switchyard Elevation Check for Kikagati Hydropower Project (15.5 MW)

Home » Projects » Turbine Axis Verification & Switchyard Elevation Check for Kikagati Hydropower Project (15.5 MW)

Project Overview

Kikagati Hydropower Project is a 15.5 MW Transboundary Hydropower Plant currently in operation. The power station is located on the Kagera River which is the main tributary to Lake Victoria, along Uganda’s International border with the United Republic of Tanzania. The site is accessible via the Mbarara – Isingiro – Murongo Highway.

Scope of work

Proess was engaged to verify the turbine axis and check the switchyard elevation

Services offered

  • Measurements using a total station.
  • Verification of the turbine axis in the powerhouse.
  • Switchyard Elevation check.
Proess-Limited-projects

Location:  Uganda/Tanzania
Client: Kikagati Power Company Limited
Period: April 2020