Preliminary Engineering for 125m Dual-Carriage Way Bridge across River Nepoko at Bolebole in DRC

Home » Projects » Preliminary Engineering for 125m Dual-Carriage Way Bridge across River Nepoko at Bolebole in DRC

Project Overview

River Nepoko traverses Haut-Uélé province in the northeastern part of the Democratic Republic of Congo (DRC). The river presents a discontinuity between the city of Isiro and Kisangani there is a need to provide a road bridge to facilitate social, economic and tourism activities in this gold-rich area of DRC.


Scope of work

The provincial government engaged Proess to undertake a pre-feasibility study for the design and build of a bridge at Bole bole along River. Nepoko.

Services offered

  • Preliminary site reconnaissance
  • Preliminary layout designs
  • Preliminary costing
  • Preliminary site assessment
Proess-Limited-projects

Location: The Democratic Republic of Congo
Client: Haut-Uélé Province
Period: 2022

Download

Related Projects