Technical Audit for Rwanda Transport Development Agency (RTDA) on the Kagitumba – Kayonza – Rusumo Road Project (208 km)View ProjectTopographical Survey of Kikagati site for the proposed Kikagati Hydropower Project (15.5 MW)View ProjectTopographical and additional geotechnical investigations for the proposed 9.5 MW Simu HPP in Eastern UgandaView ProjectKikagati Hydropower Project (15.5 MW) Additional Land Take SurveyView ProjectTopographical and Bathymetric Survey and development of Tail Water Rating Curve for Kikagati Hydropower Project (15.5 MW)View ProjectEstablishment of Control Points at Bugoye Hydropower PlantView ProjectKikagati Earthwork Survey for the Quarry AreaView ProjectEnvironment and Social Impact Assessment (ESIA) and Resettlement Action Plan (RAP) to Government of Uganda regulations and IFC Performance Standards (PS) for Sisi (7.1 MW) Hydro Power Project (HPP)View ProjectDetailed Engineering Design for upgrading of 264 Km of 25 District Roads in UgandaView ProjectPrefeasibility studies of four proposed hydropower sites (approx. 200 MW) hydropower portfolio in ZambiaView ProjectLender’s Technical Advisor for developing and construction of a 7.95 MW renewable energy portfolio in Mwenga, TanzaniaView ProjectKikagati Ground Water and Seepage Points Mapping for the Powerhouse Excavation Area.View Project12345