Topographical and additional geotechnical investigations for the proposed 9.5 MW Simu HPP in Eastern Uganda

Home » Projects » Topographical and additional geotechnical investigations for the proposed 9.5 MW Simu HPP in Eastern Uganda

Project Overview

The proposed Simu Hydropower Project will be located in Bulambuli District, Eastern Uganda. The Hydropower Plant will have a capacity of 9.5 MW and abstract water from Simu River with an intake at an elevation of 1624 masl and conveyed via a 2 m wide box canal [above ground] to a forebay at an elevation of 1620 masl.

Scope of work

Proess was engaged to conduct a topographical survey and additional geotechnical investigations for the proposed project.

Services offered

  • Topographic survey of a 300m by 500m area for proposed intake extension
  • Preparation of topographic maps
  • Excavation of 32 test pits
  • Soil profiling
  • Dynamic Cone Penetrometer tests
Proess-Limited-projects

Location: Bulambuli District, Eastern Uganda
Client: Aurecon South Africa
Period: May – July 2018