Establishment of Control Points at Bugoye Hydropower Plant

Home » Projects » Establishment of Control Points at Bugoye Hydropower Plant

Project Overview

Bugoye Hydropower Project is located on Rivers Mubuku and Esya in 13 villages with the powerhouse and switchyard in Bugoye village, Bugoye parish, Kasese District.

The project is operational, and the energy generated is fed into the national electric grid and evacuated to Nkenda Substation, located 6 kilometres (3.7 mi) from Bugoye, via a 33 kV transmission line.

Scope of work

Proess was contracted to establish the Control Points for the plant. These CPs were to be used in deformation monitoring.

Services offered

  • Monumentation of control points.
  • Making GPS static observations for purposes of determining x, y, z coordinates of CPS which were to be used in traversing and levelling.
  • Conducting traversing for purposes of determining the x and y coordinates of monitoring points (MPs).
  • Undertaking levelling for purposes of determining the z coordinates of the monitoring points (MPs).
Proess-Limited-projects

Location: Kasese District, Western Uganda
Client: Bugoye Hydro Limited
Period: May 2019


Download

Related Projects